Skip to content
HoldField
← Demo console

For surface finishing and coatings teams

Surface, coating, and plating defect evidence with controlled lighting.

Lighting-controlled surface inspection that reveals scratches, pits, coating blemishes, and rust — with coverage proof and process trends.

Run the live inspection cycleBuild a station fit report

Surface Finishing & Coatings inspection-to-evidence story

  1. Step 1: the Surface Finishing & Coatings inspection cell is running.
  2. Step 2: inspection identifies coating blemish under controlled light.
  3. Step 3: sealed evidence: lighting recipe · coverage proof.
  4. Step 4: a NCR draft is prepared — ncr draft + disposition review prepared.
  5. Step 5: human approval is required before any decision; nothing is released or closed automatically.
  6. Step 6: traceable finish evidence ready to export.

From factory signal to audit-ready record

Human-controlled
System preparedHuman approval requiredNo automatic release

Where teams usually start

  1. Outgoing coating / finish inspection
  2. In-process surface checkpoint
  3. NDT evidence capture

Example part & rule

Example part Coated pipe fitting

Reject a coating blemish above 1 mm in a critical region.

measured 1.4 mmlimit 1 mm
REJECT
coating blemishpitrustthread damage

Discovery questions for the conversation

Which inspection station should we map first?

The goal is to identify one station where this could matter — then validate with your approved parts and criteria.

Build the deployment plan

This is an example workflow for surface finishing & coatingsteams — a hypothesis, not a claim about any specific company's process.

Demo scenes are illustrative and use deterministic product scenarios. Regulated decisions remain human-controlled.