Skip to content
HoldField · QMS
Exit

Signal → Evidence → Approval → Audit

Turn inspection and configuration evidence into aerospace review packets.

Evidence sealedHuman approvalAudit packet prepared
Signal detected · 1 / 6A flight-critical part shows a dimensional issue and raises a blocking signal.

QMS story: Inspection and configuration evidence become aerospace review packets

Turn inspection and configuration evidence into aerospace review packets.

  1. Step 1 of 6 — Signal detected. A flight-critical part shows a dimensional issue and raises a blocking signal.
  2. Step 2 of 6 — Evidence sealed. Inspection image, measurement, and supplier trace are bound and sealed.
  3. Step 3 of 6 — QMS record prepared. A nonconformance and an MRB disposition packet are prepared with FAI evidence.
  4. Step 4 of 6 — Human decision required. Material Review Board approval is required — no automatic disposition.
  5. Step 5 of 6 — Signature recorded. The board records its disposition signature against the packet.
  6. Step 6 of 6 — Audit packet prepared. An audit packet shows an AS9100 / AS9102 evidence view with supplier trace.

Approval: The system prepared an NCR and an MRB disposition packet with FAI evidence. Material Review Board must approve. Human approval required before any disposition. No automatic disposition.

Readiness — AS9100 / AS9102 evidence view: Nonconformance evidence (evidence complete); FAI evidence (evidence complete); Supplier traceability (evidence complete); Disposition rationale (gap remains). An evidence view against AS9100 / AS9102 — packet readiness, not an airworthiness determination.

HoldField prepares the packet; the Material Review Board owns disposition and airworthiness.