Signal detected · 1 / 6A flight-critical part shows a dimensional issue and raises a blocking signal.
QMS story: Inspection and configuration evidence become aerospace review packets
Turn inspection and configuration evidence into aerospace review packets.
Step 1 of 6 — Signal detected. A flight-critical part shows a dimensional issue and raises a blocking signal.
Step 2 of 6 — Evidence sealed. Inspection image, measurement, and supplier trace are bound and sealed.
Step 3 of 6 — QMS record prepared. A nonconformance and an MRB disposition packet are prepared with FAI evidence.
Step 4 of 6 — Human decision required. Material Review Board approval is required — no automatic disposition.
Step 5 of 6 — Signature recorded. The board records its disposition signature against the packet.
Step 6 of 6 — Audit packet prepared. An audit packet shows an AS9100 / AS9102 evidence view with supplier trace.
Approval: The system prepared an NCR and an MRB disposition packet with FAI evidence. Material Review Board must approve. Human approval required before any disposition. No automatic disposition.
Readiness — AS9100 / AS9102 evidence view: Nonconformance evidence (evidence complete); FAI evidence (evidence complete); Supplier traceability (evidence complete); Disposition rationale (gap remains). An evidence view against AS9100 / AS9102 — packet readiness, not an airworthiness determination.
HoldField prepares the packet; the Material Review Board owns disposition and airworthiness.